Gull Lake Dam Spillway Replacement

2020

The Gull Lake Dam Association, based in Kalamazoo County, Michigan, collaborated with Prein & Newhof Engineering Consultants to address the critical need for replacing the aging concrete spillway of the dam. Concerns over the deteriorating spillway's impact on the structural integrity of the dam and the surrounding environment prompted the Association to seek expert engineering assistance. Prein & Newhof chose J.E. Tiffany & Associates, a distinguished dam engineering firm practicing throughout Michigan, with the task of designing the new spillway for the project. The project aimed to create a modern spillway with advanced flow regulation capabilities and enhanced energy dissipation features to ensure the safety and longevity of the dam.

Gull Lake Damn

Concrete Spillway Prior to Repairs

The Project Story

Gull Lake Dam

New Spillway Control Gate

Gull Lake, located in Kalamazoo, Michigan, covers approximately 2030 acres and holds significant ecological and recreational value for the community. However, the dam responsible for regulating the lake's water levels had an outdated concrete spillway in dire need of replacement. Recognizing the urgency of the situation, the Gull Lake Dam Association took proactive measures to address the issue.

Upon collaboration with Prein & Newhof, it became evident that the project required specialized expertise in spillway engineering. J.E. Tiffany & Associates, renowned for its engineering expertise and commitment to excellence, was approached for its proven track record in this field. With a deep understanding of the intricacies involved in dam construction and renovation, J.E. Tiffany & Associates eagerly accepted the challenge.  Prein & Newhof focused their efforts on embankment stability improvements.

New Concrete Spillway

New Concrete Spillway & Seeded Native Flowers

The design phase commenced with meticulous planning to ensure the new spillway met regulatory standards and addressed the specific requirements of the Gull Lake Dam. Incorporating advanced engineering principles, the team conceptualized a spillway featuring a unique drop-down gate mechanism for precise flow regulation. Additionally, energy dissipation features were integrated at the spillway's lower end to mitigate potential downstream impacts.  J.E. Tiffany & Associates designed a temporary siphon spillway to handle flows during the complete closure of the spillway for reconstruction.

Collaboration between the Gull Lake Dam Association, Prein & Newhof, and J.E. Tiffany & Associates was instrumental throughout the project. Regular site inspections, design reviews, and consultations ensured alignment with the client's vision and objectives. The construction phase proceeded smoothly, with attention to detail and adherence to safety protocols being paramount.

Outcome

The successful completion of the Gull Lake Dam spillway replacement project, spearheaded by J.E. Tiffany & Associates, marks a significant milestone in ensuring the long-term safety and sustainability of the dam infrastructure. The new spillway, equipped with state-of-the-art technology and engineering innovations, provides enhanced control over water flow while minimizing environmental risks.

Key outcomes of the project include:

  1. Enhanced Safety: The modernized spillway significantly reduces the risk of structural failure and flooding, safeguarding both the dam and downstream communities.
  2. Improved Regulation: The incorporation of a drop-down gate allows for precise management of water levels, ensuring simple, optimal lake level control.
  3. Environmental Sustainability: Energy dissipation features minimize the ecological footprint of the spillway, preserving the natural habitat and water quality downstream.
  4. Community Benefit: Residents and recreational users of Gull Lake can continue to enjoy its beauty and amenities with confidence in the reliability of the dam infrastructure.

In conclusion, the collaborative efforts of the Gull Lake Dam Association, Prein & Newhof, and J.E. Tiffany & Associates have resulted in a successful project outcome that serves as a testament to proactive infrastructure management and engineering excellence. The newly replaced spillway, situated amidst the picturesque landscape surrounding Gull Lake, stands as a symbol of the commitment to safety, innovation, and sustainability.

Completed Spillway

 

Get in touch

You can give us a call today at (231) 735-4546 or submit the form below.